Example of Investment Pay Back

 

This Example assumes a material cost of .045 cents (4.5 cents) per square foot.
This would include cost of consumable's, i.e. Acrylic Sealant, Paper, Tape, Tip's, etc..
A 20 week season. (Starting in May and ending in September.) A season could be considerably longer as only a 50° temperature is needed.

An average 2 car driveway of 1,400 square feet (20 foot wide and 70 foot long).

 

20' x 70' = 1,400 sq. ft.

1,400 sq. ft. x .12 cents (12 cents per sq. ft.) = $168.00 (total price)

1,400 sq. ft. x .045 cents (4.5 cents per sq. ft.) = $63.00 (cost of materials)
$168.00 (total price of job) minus $63.00 (cost of materials) = $105.00
$105.00 x 10 (2 driveways a day, 5 times a week) = $1,050.00
$1,050.00 (net per week) x 20 (20 weeks in the season) = $21,000.00

 

 

 

 

 

 

 

                                             Approximate time needed per Driveway for one person (includes preparation and sealing):

1,500 sq. ft. or less 1hr. 10 min.  
1,500 - 2,000 sq. ft. 1hr. 20 min.   
2,000 - 3,000 sq. ft. 1hr. 30 min.

 